Alpine Energy

Acessibility Quick Links

Site Search form

When transporting high loads such as houses, machinery and industrial equipment, a high load permit is required.

Once the application is submitted to us, staff will process the application to determine if an electricity shutdown is required and then issue a high load permit. The transporting vehicle must carry the permit.

There are two ways you can apply for a high load permit. Either complete the online form, or download and completed the pdf form.

Apply online for a high load permit

Download the PDF application