Alpine Energy

Acessibility Quick Links

Site Search form

Standard connection charges

Cable to pole /  Cable to distribution box

Connections to existing connectable network up to 45kVA in rated capacity and located less than 0.4m from the customers boundary to the network distribution box or pole where the customer has supplied the service cable to the point of network connection and includes;

  • Cable to pole
  • Cable to distribution box
  • Simple overhead to underground asset relocations
  • Streetlight connections
Connection type Posted connection charges
Single Phase connection Three Phase connection
Standard connection including tails for aluminium up to 185mm2 $550 $900
Standard connection including tails for aluminium up to 185mm2 and trenching up to 0.5m in footpath on street verge $700 $1050
ICP Establishment Fee $300
Includes
  • Administrative cost for application
  • Cost for connection on site
Excludes
  • GST
  • Distributed generation application fees
  • Inspection fee
  • Additional metering equipment costs
  • Additional network side or medium voltage equipment, transformers, upgrades to distribution boxes or poles
  • Service cabling to point of connection
  • Network outage planning and switching
  • Cabling greater than 185mm2 and/or greater than 0.5m trenching

Most customers should find everything they need under Get connected, but if you're planning a larger project, want to know how network capital costs are outlined or require more detailed information, you can view our:

Connection Pricing Policy

Network Connections and Extensions Policy

Connection charge reconciliation

Under Electricity Authority requirements, electricity distributors must be able to provide a standardised breakdown of connection charges. This is called a connection charge reconciliation.

A reconciliation shows how your connection charge is allocated into:

  • The direct costs of connecting you to the network (incremental costs)
  • Your potion of the cost of using the shared network (network cost contribution)
  • The expected lines revenue you will pay via your power bill, over time (incremental revenue)

To request a reconciliation, email: networkapplications@alpineenergy.co.nz

What it means for you

You can request a reconciliation for your connection to better understand the charge that has been calculated.

A reconciliation:

  • Is provided for transparency purposes.
  • Does not change your quoted connection price.
  • Uses a nationally standardised format set by the Electricity Authority.
  • May group costs differently from your original quote.

For standard residential and small business connections, we provide a standard reconciliation based on average costs and revenues for that connection type, rather than preparing a customised model for every application.

Connection charge reconciliations follow a standard format required by the Electricity Authority and can be detailed and technical. If you'd like help understanding a reconciliation, you can refer to Electricity Networks Aotearoa's reconciliation explainer or contact us and our team will be happy to help.

Pioneer Schemes

Where a customer funds a network extension that may be used by future connections, our Pioneer Scheme helps ensure costs are shared fairly.

If another customer later connects using infrastructure that has already been funded by a previous customer, they may be required to contribute towards the original cost. A rebate is then paid to the customer who originally funded the extension.

This approach helps ensure that the cost of extending the network is shared fairly among the customers who benefit from it.

Alpine Energy administers the scheme, including:

  • Determining whether a project qualifies as a Pioneer Scheme.
  • Calculating contributions and rebates.
  • Collecting payments from future connecting customers.
  • Providing rebates to eligible pioneers.

Our policy has been developed to meet both the requirements of Part 6B.6 to 6B.9 of the Electricity Participation Code, as well as the policies and practices that guide our connections arrangements.

Further information is available in our

Pioneer Scheme Policy

Current status: There are currently no active Pioneer Schemes.